Loading...
HomeMy WebLinkAboutCO 9 CAG-18-240, CO #9-20 0 Community Services Facilities Division CONTRACT NO: CAG-18-240 CO NO. 9 CONTRACT CHANGE ORDER(CO) PROJECT TITLE: RENTON PW-SIGN SHOP EXPANSION OPTIMUS CONSTRUCTION (CONTRACTOR) The following mutually agreed to and Owner approved Change Order Proposal(s)are hereby incorporated by reference into the contract. Description Amount(without WSST1 COP#7 General conditions extension due to window sizing $ 24,586.10 change and reordering delay plus interior revisions. CONTRACT SUM: C.) NO CHANGE 0 INCREASE OF: 1 $ 27,044.71 I U DECREASE (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: 1-:7 NO CHANGE INCREASE OF: 01 U DECREASE CALENDAR DAYS The foregoing amount covers everything required in connection with the change.All other provisions of the contract remain in full force and effect. CONTRACT SUMMARY(Internal Use Only) ORIGINAL CONTRACT SUM(with tax) $ 690,124.64 PREVIOUS ADDITIONS/DELETIONS $ 43,993.15 PREVIOUS TOTAL $ 734,117.79 CHANGE AMOUNT THIS CHANGE ORDER $ 27,044.71 REVISED CONTRACT TOTAL $ 761,162.50 PERCENT TOTAL CHANGE FROM ORIGINAL 10.29% NOTICE TO PROCEED DATE March 12,2019 PREVIOUS CONTRACT CALENDAR DAYS 150 PREVIOUS SUBSTANTIAL COMPLETION DATE August 9,2019 REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORDER 150 11` CURRENT SUBSTANTIA •• •N D E t 9,201 P'" z L � t Z7 2� Architect Ack .gement Date Contr..' Ack owledgement Date The City of Renton hereby accepts the foregoing Change Order Proposal(s).This formal acceptance constitutes a Change to the contract only when authorizing signature is affixed.Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in n-x'• wit .is Change Order. /1i// [, / '-0 2/2fAd AU/ •RIZI 7 SIGNATURE DATE OPTIMUS CONSTRUCTION RNO DEVELOPMENT INC City of Renton -SIGN SHOP EXPANSION General Contractor Change Order Rquest Date 8/23/2019 Project Name: City of Renton-Sign Shop Expansion COP# 7 PR# Project# 2019-01 RFi# Description: General conditions schedule revsion due to window sizing change and reordering delay. Also changed the interior wall layout and added one door. Days beyhond July 8th Negotiated With Michael Nolan Supervision $58,800/120=$490.00*30= $14,700.00 61.25 Per Hour $ 14,700.00 Auto/Fuel $1,800/120=$15*30= $450.00 -255 $195.00 Temp Facilities $15,800/120=$131.66*30= $3,950.00 -1975 $1,975.00 Overhead $45,000/1204375*30= $11,250.00 -4250 $7,000.00 GC Labor Cost $ 23,870.00 GC Labor Total Cost $ 23,870.00 MATERIAL COST Material.Cost $ - Suppliers Material Cost $ - EQUIPTMENT COST Rental Equipment $0.00 Owned Equipment $0.00 Equipment Cost $ - Material&Equipment Const $No Charge OH&P @ 22% $ - Material&Equipment Total Cost $ - Backup documentation is Attached. Subcontractors Cost Name Item Sub-Profit Subs Cost Less Profit $0.00 Subcontractor Cost(less profit) 0.00 Subcontractor Profit 0.00 Subcontract Cost Total 0.00 GC Labor, Material&Equipment Total Cost $ 23,870.00 Subcontractors Total Cost $ - GCOH&Pon Sub @7% $ - GC&Sub's Total Cost $ 23,870.00 Insurance @ 1% $ 238.70 Bond @ 2% $ 477.40 Total Cost $ 24,586.10