Loading...
HomeMy WebLinkAboutAdden 2     AMENDMENT NO. _2_ TO AGREEMENT FOR DESIGN AND  CONSTRUCTION ADMINISTRATION SUPPORT SERVICES FOR  SUNSET NEIGHBORHOOD PARK, PHASE 2      THIS AMENDMENT, dated ______________, 2020, is by and between the City of Renton (the  “City”), a Washington municipal corporation, and HBB Landscape Architecture, Inc.  (“Consultant”), a Washington corporation. The City and the Consultant are referred to collectively  in this Amendment as the “Parties.” Once fully executed by the Parties, this Amendment is  effective as of the last date signed by both parties.    Whereas, the City engaged the services of the Consultant under Agreement CAG‐18‐063, dated  April 10, 2018, to provide necessary services for the professional design and construction  administration support services for Sunset Neighborhood Park, Phase 2  (referred to herein as  the “Agreement”);    Whereas, the Parties wish to amend the Agreement to change the scope of work and change the  compensation in order to modify the existing light pole foundations.    NOW THEREFORE, It is mutually agreed upon that CAG‐18‐063 is amended as follows:    1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit  A, which is attached and incorporated herein.    2. Compensation: Section 4, Compensation, is amended so that the maximum amount of  compensation payable to Consultant is increased by $_2,376.78___ from  $__493,354.50__ to $__495,731.28_, plus any applicable state and local sales taxes. The  additional compensation shall be paid based upon Work actually performed according to  the rate(s) or amounts specified in Exhibit A , which is attached and incorporated herein.     3. All terms of the Agreement not explicitly modified herein shall remain in full force and  effect and such terms shall apply to Work performed according to this Amendment as if  fully set forth herein.    IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date  last signed by the Parties below.      CITYOFRENTONCONSULTANTBy:j.\jAdministrator,CommunityServicesPresidentDateDateApprovedastoLegalFormBy:____________________________ShaneMoloneyRentonCityAttorneyContractTemplateUpdated01-15-2020aPAGE2OF2 Hough Beck & Baird Inc. 206.682.3051 Phone 215 Westlake Avenue North 206.682.3245 Fax Seattle, WA 98109-5217 www.hbbseattle.com Page 1 of 1 Contract Amendment The above contract addendum request is beyond the existing scope of work tasks as described in our agreement dated April 10, 2018 and will be billed at the rates established in the contract. If you have any questions or need clarification regarding the addendum, please call. ~ Thank you. Date 16 March 2020 HBB Project No. 2018-12 Project Name Sunset Neighborhood Park, Phase 2 Addendum No. TWO Description of Amendment The original scope and budget for RFI support during construction did not anticipate a redesign of some of the parks’ existing electrical pole foundations as a result of RFI 005. During the course of construction, it was observed that the soils and rain garden slopes make retaining the existing foundations but with extensions to raise them up would provide a more stable foundation in the long run. This work would affect poles #76, 77, 78, 80, and 81 and require additional 2 to 3 structural details be developed for the project. This amendment is for the additional time to develop the structural details, provide internal review and coordination, and potential revisions after city engineer review. Schedule: There is no impact to the schedule given this additional work. Addendum Fee The additional fee for the level-of-effort is $10,045.14. Fee breakdown is attached to this Contract Amendment as follows: Exhibit A for HBB $191.78 Exhibit B for PND $2,185.00 Original Total Contract Amount $ 493,354.50 Contract Amendment ONE dated December 17, 2019 $ 0,000.00 (Contract Date Extension Only) Contract Amendment TWO dated March 16, 2020 $ 2,376.78 New Total Contract Amount $ 495,731.28 Contract Schedule and Completion Date do not change EXHIBIT A EXHIBIT A Project: Owner: Firm: Date: Principal PM / LA Design Comp./ Tech Business Dev.Admin. $ 191.78 $ 139.47 $ 83.15 $ 71.08 $ 107.29 $ 65.71 TASK 6.1 0 0 0 0 0 $191.78 6.1 Meetings 6.2 Field Review 6.3 Submittals & Requests for Information (RFI 005 coord 1 6.4 Change Orders 6.5 Record Drawings 1 0 0 0 0 0 $191.78 $0.00 $0.00 $0.00 $0.00 $0.00 $191.78 Reimbursable Expenses Mileage, parking, reproduction, printing, and other project related costs.1,700.00$ 1,891.78$ TASK SUBTOTAL Total Cost Scope of Work Total Hours Construction Adminstration Assistance Sunset Park Phase 2, Exhibit A City of Renton Hough Beck & Baird Inc. (HBB) 03/16/20 TOTAL COST OF SERVICES Reimbursable Expenses 1 of 1 C:\Users\dkoonts\Desktop\HBB Contract Amendment #2\Sunset Park Ph2 Amendment 2 HBB Fee.xlsx EXHIBIT B SCOPE AND FEE PROPOSAL  SUNSET NEIGHBORHOOD PARK – PHASE 2 ENGINEERING AND DESIGN SERVICES March 16, 2020 1. SCOPE OF WORK This scope of work and fee proposal (SOW), submitted to HBB, Landscape Architects on behalf of the City of Renton (COR), describes the additional engineering, services to modify the project design details to generally incorporate the following:  Develop additional structural details for construction to modify existing luminaire pole bases #76, 77, 78, 80 and 81 as noted in RFI 05.  Provide drawings for city engineer review. Incorporate city engineer review comments.  Revise and re-submit an amended response to RFI 05 2.. ADDITIONAL SERVICES Task 06 – Construction Administration Assistance PND proposes adding the additional services outlined in section 1 and the attached Fee Schedule to the existing contract subtask 06 Construction Administration Assistance. 3. ASSUMPTIONS  Per the base contract and prior amendments 4. EXCLUSIONS The following items are excluded from this SOW and are not included in the cost estimate:  Per the base contract and prior amendments 5. DELIVERABLES  Revised RFI 05 response with additional structural details outlined in sections 1. 6. PERSONNEL Key team personnel for the project include:  Jon Keiser, Principal-in-Charge and QA review, Engineer of Record  Christopher Wiest, PE, Project Manager, Civil Design Lead 6. FEES PND will provide these services on a time and materials basis not to exceed $1,640.00 without prior written authorization from COR. Please reference the attached cost proposal for a detailed break- down of allocated time. Time for PND staff will be billed per the base contract. Attachments  Exhibit B - PND Fee Estimate EXHIBIT B Project: Sunset Neighborhood Park - Phase 2 - Task 006 - Amendment 2 Owner: Firm: Date: Senior Engineer VII Senior Engineer V Senior Engineer III Staff Engineer IV CAD Designer VI $ 205.00 $ 175.00 $ 150.00 $ 110.00 $ 110.00 019.01 1 2 5 3 5 $2,185.00 1.1 Project Coordination 12 1.2 Detail Design and Analysis 5 3 1.3 Design Development 5 125 3 5 $205.00 $350.00 $750.00 $330.00 $550.00 $2,185.00 Subconsultants None -$ Reimbursable Expenses Mileage, parking, reproduction, printing, and other project related costs.-$ 2,185.00$ Total Cost Project Management 2020 TASK SUBTOTAL City of Renton PND 03/16/20 Scope of Work Total Hours Page 1 154016 ‐ TO 019.01 ‐ Fee Est ‐ rev 2