Loading...
HomeMy WebLinkAboutMFP20003326.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP20003326 IVR Number: 20003326 Permit Informaon Permit Name:Northwest Pipeline Franchise Agreement Address/Locaon :07/29/2020Application Date:1432600115Parcel Number:16004 116TH AVE SE Permit Type:08/03/2020Issue Date:Franchise Permit Work Class:08/03/2021Expiration Date:Major Utility Franchise Type:Natural Gas Description:Investigate short in pipeline cathodic protection system at road crossing at 116th Ave SE by excavating both ends of casing, flushing casing with water and filling with wax. Approved Traffic Control Plan Required. Restoration per City of Renton Standards. Call in Job Start 24 hours in Advance to inspection line at (425) 430 7203. Contacts Name Address PhoneTypeBilling Clay Gustaves Williams - Northwest Pipeline Corp 22909 NE Redmond Falls City Rd Redmond, WA 98053 C: (425) 301-1068Applicant RONALD MERTZ NORTHWEST PIPELINE 22909 NE Redmond Fall City Highway Redmond, WA 98053 B: (206) 915-0589Contact Steve Crosslin Northwest Pipeline LLC PO Box 2400 MD46 Tulsa, OK 74102 B: (425) 868-1010 C: (918) 573-2520 Contact Grant Jensen Northwest Pipeline Corp 22909 NE Redmond-Fall City Rd Redmond, WA 98033 B: (425) 868-1010Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Williams - Northwest Pipeline Corp 22909 NE Redmond Fall City Rd Redmond, WA 98053 Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Northwest Pipeline LLC 425-301-1068 Clay Gustaves clay.gustaves@williams.com South Seatte Casing Short Investigation 1226296 16004 116th Ave SE Investigate short in pipeline cathodic protection system at road crossing casing crossing 116th Ave SE by excavating both ends of casing, flushing casing with water and filling with wax. Majority of work outside road right of way. TBD 5/20/2020 MFP20003326 Holly Powers 7/29/2020 Scott Warlick 8/3/2020 Scott Warlick CED 8/3/2020 9 am 3 pm X 16004 116th Ave SESidewalkSidewalkSPEED LIMIT 5530 SPEED LIMIT 5520 SCHOOL 116th Ave SESE 160th St 117th Ave SEX X X NOPARKINGFROMTO TOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 R7-T39 Legend BE PREPAREDTO STOP be prepared to stop Cone flagger DETOUR M4-9b detour for peds DETOUR M4-9b detour for peds (R)NOPARKINGFROMTOTOW AWAY AREAPHONE 685-5444YOUR COMPANY NAME 555-5555 R7-T39ROADWORKAHEADroad work ahead RS-031 Bus Stop Tubular SHOULDERCLOSED W20-301 SHOULDERWORKAHEAD W21-5c Shoulder work Work Area Traffic Control Plan P# Urban Streets Rural Roads, Urban Arterials, Residential, BusinessDistrict Rural Roads and Urban Arterials Rural Roads Rural Highways Freeways and Expressways 55/70 MPH 60/65 MPH 45/55 MPH 35/40 MPH 25/30 MPH 25 MPH or less 1500' +- 800'+- 500'+- 350'+- 200'+- 100'+- (2) (2) Sign Spacing (1) (1) All spacing may be adjusted to accomodate interchange ramps, at-grade intersections, and driveways. (2) This spacing may be reduced in urban areas to fit roadway conditions. Not drawn to actual scaleSigns not spaced according to scale N CHANNELIZING DEVICES SPACING (FEET)MPH TAPER TANGENT 50/70 35/45 25/30 40 4020 30 60 80 X= TCP Designs Jera Kane TCS # 542238 Phone: 206-573-2962 Trafficplandesigns@gmail.com Date: 6/5/2020(206) 243-8004 Jobsite Address: 16004 116th Ave SE Renton, WA Contact: Jake Kiliz Email: binghamcreek@yahoo.com Phone: (360)789-7923 Work Hours: N/A Type of Work: Casing flush and inspection 1395 W20-7a BE PREPAREDTO STOP W20-7b Signage required for any flagging in right of way SHOULDERWORK AHEAD W21-5c SHOULDERWORK AHEAD W21-5c SHOULDERCLOSED W20-301 SHOULDER CLOSED W20-301 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 DETOUR M4-9bDETOURM4-9b(*) REQUIREMENTS *Signs, Devices and spacing shall conform to the Renton TCM/MUTCD. *Coordinate/facilitate driveway/load acces. *Maintain 11' vehicle travel lane widths. *Maintain 4' sidewalk widths unless otherwise approved via this TCP. Sidewalks are either open or not open. A sidewalk is closed when a minimum of 4' cannot be maintained. Pedestrians shall not be routed within 2' of the curb face/vehicle lane edge. *Priority access shall be provided to emergency vehicles. *Notify Metro of bus route/stop impacts *Notify METRO 15 days in advance of work. METRO may require a weekend work schedule. *Protected pedestrian reroutes shall maintain ADA requirements: ADA compliant curb ramps and cane detection to transition from sidewalk to street level and back. X X X X X X Existing Easement Work Area Parking/Staging www.invarion.comMFP20003326 © 2020 Microsoft Corporation © 2020 DigitalGlobe ©CNES (2020) Distribution Airbus DS NMFP20003326