Loading...
HomeMy WebLinkAboutAdden 7AMENDMENT NO. _7 TO AGREEMENT GENE COULON MEMORIAL PARK STRUCTURAL REPAIRS THIS AMENDMENT, dated ____________________, 20_______ and between the City of Renton (the “City”), a Washington municipal corporation, and PND Engineers, Inc. (“Consultant”). The City and the Consultant are referred to collectively in this Am endmentas the “Parties.” Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-17-124, dated June 13, 2017, to provide necessary services for the Gene Coulon Memorial Park Structural Repairs (referred to herein as the “Agreement”); Whereas, the Parties wish to amend the Agreement to change the scope of work, change the time for performance, and change the compensation in order to provide an one-year warranty inspection of the construction work of the structural repairs at Gene Coulon Memorial Park. NOW THEREFORE, It is mutually agreed upon that CAG-17-124 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-7, which is attached and incorporated herein. 2.Time of Performance: Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit A-7. All Work shall be performed by no later than January 31, 2021. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $__3,727.40___ from $_285,655.00__ to $_289,382.40_, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit A-7 of the Agreement. 4.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CAG-17-124, Adden #7-20 December 17th 20 (approved via email from Cheryl Beyer) December 7, 2020 Alan Wyatt Capital Projects Manager City of Renton Parks Planning and Natural Resources 1055 S Grady Way, 6th Floor Renton, WA 98057 Subject: Gene Coulon Park Structural Upgrades Amendment #7 – One-Year Inspection Dear Alan: The City of Renton (COR) has requested a proposal for services by PND Engineers, Inc. (PND) to perform a one-year post-construction inspection of the Structural Upgrades project in Gene Coulon Park (design contract CAG-17-124) before the construction warranty expires. This project included upgrades to the over-water decking surrounding Ivar’s restaurant, replacement of the day moorage floats, and replacement of timbers on the boat launch breakwater. Scope The following scope items are included: Task 1A: Site Inspection and Report x Ivar’s deck including full visual inspection from top of deck, full visual inspection of new supporting structure from beneath via access hatch. All new construction including pile tops, beams, deck grating, wave skirt, bullrails, and railing will be inspected. x Transient moorage floats including full visual inspection from top of floats. All new construction including floats, decking, struts, and pile cap modifications will be inspected. x North water walk work included wave skirt removal and no new construction, so no inspection will be performed. x Boat launch repairs are mostly below a permanent timber deck and cannot be accessed for visual inspection. Repairs to the dolphins will be inspected. x South waterwalk concrete patch repairs are not visually accessible from the topside and will not be inspected. x Sailing club float including inspection of repairs to the railing and hinge. Freeboard will be inspected to assess added flotation. x Trestle bridge repairs, including full visual inspection of timber cap and knee brace repairs. x Wave break including full visual inspection of replacement of timber wave break with plastic lumber, and connections. x Report including assessment of items listed above, recommendations for repairs, and log of photographs taken on-site. Task 1B: Correspondence and Follow-up x Includes time for City support in coordination with Quigg, if a formal letter or meetings are required to address repair items found during construction. EXHIBIT A -7 2 Schedule The construction warranty expires on January 3, 2021, exactly one year after issuance of the Final Completion certificate by the COR to the contractor, Quigg Brothers, Inc. of Aberdeen, Washington (Quigg). PND proposes to perform the inspection during the weeks of December 21 or December 28, issuing a report to the COR before December 30, 2020. Estimated Fee We propose to complete these tasks on a time and materials basis with a not-to-exceed value of $3,727.40 as detailed in the attached fee proposal. PND will use our updated standard rate schedule (November 2019) to invoice costs for labor for these tasks. Thank you for the opportunity to present this proposal. We look forward to continuing to work with the City and delivering the best and most cost-effective solutions to your citizens. Sincerely, Jon B. Keiser, P.E Colin Kuester, P.E. Vice President Senior Engineer Attachments: 1 – Fee Estimates 2 – PND Billing Rates Effective November 2019 Revised: 12/7/2020GENE COULON PARK - STRUCTURAL REPAIRS - AMENDMENT 7Task ItemSenior Engineer VIISenior Engineer VSenior Engineer IVSenior Engineer IIISenior Engineer IStaff Engineer IIICAD Designer VITechnician VITechnician IVTotal LaborNo. Task (Scope of Services) $205 $175 $165 $150 $130 $105 $115 $130 $95 Hours Cost Expenses Task totals1.0 Coulon Park Structural Repairs 1-Year Inspection1A On-site Inspection 2 14 2 18 $2,700.00 $17.40 $2,717.401B Report, Correspondence and Follow-Up 2 4 6 $1,010.00 $1,010.00Subtotal400180000224$3,710.00 $17.40 $3,727.40TOTAL400180000224$3,710.00 $17.40 $3,727.40EXPENSES:Cost ExpensesItem Quantity # Unit per Unit Markup Cost1.01A Site Visit Mileage 30 1 EA $0.580 1.0 $17.40TOTAL EXPENSES$17.40SUBCONSULTANTS:Subcontract Subcon.TOTAL SUBCONSULTANTS$0.00Total - Labor$3,710.00Total - Expenses$17.40Total - Subconsultants$0.00TOTAL - $3,727.40 Professional:Staff Engineer I $90.00 Staff Engineer II $95.00 Staff Engineer III $105.00 Staff Engineer IV $110.00 Staff Engineer V $115.00 Staff Engineer VI $130.00 Senior Engineer I $130.00 Senior Engineer II $140.00 Senior Engineer III $150.00 Senior Engineer IV $165.00 Senior Engineer V $175.00 Senior Engineer VI $190.00 Senior Engineer VII $205.00 GIS Specialist $95.00 Environmental Scientist I $95.00 Environmental Scientist II $110.00 Environmental Scientist III $125.00 Environmental Scientist IV $140.00 Environmental Scientist V $155.00 Environmental Scientist VI $170.00 Surveyors:Senior Land Surveyor I $105.00 Senior Land Surveyor II $115.00 Senior Land Surveyor III $125.00 Technicians:Technician I $50.00 Technician II $75.00 Technician III $85.00 Technician IV $95.00 Technician V $115.00 Technician VI $130.00 CAD Designer III $75.00 CAD Designer IV $90.00 CAD Designer V $105.00 CAD Designer VI $115.00 PND ENGINEERS, INC. - SEATTLE OFFICE STANDARD RATE SCHEDULE EFFECTIVE NOVEMBER 2019