HomeMy WebLinkAboutRevisions to Existing Land Use ApplicationDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 2 | Published: 4/18/2022
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 | www.rentonwa.gov
REVISIONS TO EXISTING LAND USE APPLICATIONS
Published : 4/18/2022
ELECTRONIC FILE STANDARDS
All documents MUST be submitted electronically. Specific file naming conventions for submitted plans are required to
facilitate the electronic plan review process. Failure to adhere to the sample file naming format listed in the Electronic
File Standards Handout may result in a request for resubmittal and/or delay the plan review process, deeming the
application incomplete.
APPLICATION SUBMITTAL HOURS
Applications should be submitted to Planning Division staff electronically, not in person. Please email or call your
assigned Project Manager to submit your application. If you have any Planning related questions you may reach out to
Planning Customer Service at 425-430-7294 or planningcustomerservice@rentonwa.gov.
SUBMITTAL CHECKLIST
The submittal checklist is not an exhaustive list of submittal requirements and may be modified in cases where additional
information is required to complete the review of an application. The applicant should contact the assigned Project
Manager if there are any questions regarding submittal requirements.
All Application Materials Required Unless Waived by City Staff
1. Narrative: Please provide a clear and concise description detailing the nature and the extent of your
revisions. Please include your project’s City Land Use Application file number (see page 2 for sample
narrative).
2. Fees: Please submit any required additional review fees (e.g. if a variance or other additional review has
now been identified; see Fee Schedule). Checks should be made out to the City of Renton and cannot be
accepted for over the total fee amount. Credit cards may also be used to pay required application fees.
Fees are paid at Cashier on the 1st Floor City Hall. Any fee refund requests must be submitted in writing.
3. Revisions: Please provide all revised submittal sheets (unless otherwise approved by the Planning
Division).
4. Colored Rendering: A computer-generated exterior color view of the proposed building(s), site, and
landscaping in three (3) dimensional form.
RESOURCES
City of Renton Forms
Electronic File Standards
Note: Extensive changes to your original application will require a new application. Authorization from the Planning
Division is needed for any revisions submitted after the end of the environmental determination appeal period.
REVISIONS TO EXISTING LAND USE APPLICATIONS (CONT ’D )
Page 2 of 2 | Published: 4/18/2022
April 1, 2022
Mona Davis
City of Renton
Planning Division
1055 Grady Way South
Renton, WA 98057
SUBJECT: Revisions to Lake View Apartments Site Plan
City File #LUA22-000001, SA, ECF
Dear Ms. Davis:
The Lake View Apartments site plan application has been revised in response to preliminary concerns of various City
Departments. The density of the project has been reduced from 35 units per acre to 30 units per acre. We are also submitting
a variance request in conjunction with this site plan application in order to allow construction of Building C within 25 feet of the
northern property line (City Zoning Code requires a 35-foot setback from arterial streets).
Attachments and revisions include:
1. Application Form: A revised master application form. This should replace our previously submitted application forms.
2. Project Narrative: A revised project narrative to replace our original submittal.
3. Environmental (SEPA) Checklist: Revised environmental checklists. Please replace the environmental checklists with these
revised versions.
4. Site Plan (Sheet 1 of 4): Revised site plan and one colored version of our revised site plan for replacement. Please retain
sheets 2, 3 and 4 of this plan set previously submitted.
5. Landscaping Plan (Sheet 1 of 2): Revised landscape plan and one colored version of sheet 1 of 2 of our revised
landscaping plan set for replacement.
6. Grading Plan (Sheet 3 of 4 of engineering plans): Please replace only sheet 3 of 4 of this plan set. Retain original sheets 1,
2 and 4 of this plan set.
7. Traffic Study (New): A new traffic study is provided. No traffic study was previously submitted.
If you have any questions regarding these revisions, please contact me at (206) 555-2222.
Sincerely,
Adam Smith
Project Architect
Sample Narrative