Loading...
HomeMy WebLinkAboutWall and Vault Requirements rentonwa.gov/permitcenter | permittech@rentonwa.gov | 425-430-7215 2/13/2024 Page 1 of 2 CITY OF RENTON Ι PERMIT CENTER SUBMITTAL REQUIREMENTS VAULTS AND WALLS HOW TO APPLY No paper documents are accepted at the City of Renton Permit Center. Your application and the required documents must be submitted using a secure file share link provided by CED Permit staff. When you are ready to submit your application, email: permittech@rentonwa.gov with the following information: • Application Type • Address of Proposed Work • Project Name A secure file share link will be created for you to upload your application and plans/documents. Submittals will be reviewed for completeness by Permit Staff within 5 business days of your submittal. WHAT NEEDS TO BE SUBMITTED 1. Completed and signed Building Permit Application. 2. A complete set of engineered plans, including site plans. 3. Where specifications supplement the construction drawings, include a separate file for structural details, elevations, and civil plans. 4. Stress/structural calculations, if applicable. 5. Geotechnical report, if applicable. 6. Special Inspection Authorization Form (See attached). THE SITE PLAN SHALL CLEARLY SHOW THE FOLLOWING 1. Scale (1”=20’ or 1”=40’) and north arrow. 2. Location, identification and dimensions of all buildings, property lines, streets, alleys and easements. Indicate condition of all public right-of-ways and submit verification of right to use easements. 3. Location of wall or vault and distance to all buildings, property lines, streets, alleys and easements. GENERAL NOTES MUST INCLUDE THE FOLLOWING (PREFERABLY ON COVER SHEET) 1. The full name of the project. 2. The name, address, and telephone number of the owner and agent(s). 3. The area, in square feet or acres, of the project site. 4. The existing zoning of the project site. 5. The seismic design category of the project site (D). 6. Structural design criteria. 7. The IBC designation of occupancy group (U—1). rentonwa.gov/permitcenter | permittech@rentonwa.gov | 425-430-7215 2/13/2024 Page 2 of 2 CITY OF RENTON Ι PERMIT CENTER SPECIAL INSPECTION AUTHORIZATION FORM PROJECT NAME: ADDRESS: Responsibility under Section 109 of the International Building Code (IBC) for selection of a testing laboratory lies with the owner or his agent (architect or structural engineer of record). The following have been or will be contracted with to perform all SPECIAL INSPECTIONS required per Chapter 17, IBC and the Renton Building Department. STRUCTURAL CONSIDERATIONS TESTING AGENCY: PHONE: ADDRESS: GEOTECHNICAL CONSIDERATIONS PER SOILS REPORT GEOTECHNICAL ENGINEER OF RECORD: TESTING AGENCY: PHONE: ADDRESS: We understand that these assignments cannot be changed (transferred) once the building permit has been issued without the approval of the Building Official. The completed form must be returned to the City of Renton Plans Examiner prior to issuance of the Building Permit. PRINT NAME: SIGNATURE OF OWNER/AUTHORIZED AGENT: DATE: