Loading...
HomeMy WebLinkAboutAddendum 4Duvall Avenue NE ADDENDUM NO. 4 TED4004100 June 17, 2021 Page 1 of 11 Addendum No. 4 Duvall Avenue NE Contract No.: CAG-20-065 Date of Issue: June 17, 2021 Bid Due Date: June 22, 2021 (No Change from Addendum No. 3) Date of Bid Opening: June 24, 2021 (No Change from Addendum No. 3) ATTENTION: ALL BIDDERS AND PLAN HOLDERS: The Bid Documents for the above-named project are modified as described below. Bidders shall take this Addendum into consideration when preparing and submitting their bids. Bidders shall attach this addendum to their copy of the Contract Documents, and shall acknowledge receipt of this Addendum on the Proposal Signature Page. A Proposal may be considered irregular and may be rejected if the receipt of Addenda is not acknowledged. A Proposal will be considered irregular and will be rejected if the Schedule of Prices included in this Addendum is not completed and submitted with the Proposal. THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: 1. PROPOSAL - SCHEDULE OF PRICES REPLACE the Schedule of Prices in the Proposal (8 pages) with the revised Schedule of Prices (8 pages) attached to this Addendum. The Schedule of Prices was revised to reflect the following: • Item No. A96 “FUEL COST ADJUSTMENT” is added. • Item No. A97 “STEEL COST ADJUSTMENT” is added. • Item No. A98 “MAILBOX SUPPORT, TYPE 1” is added. 2. SPECIAL PROVISIONS The following special provisions are revised for this contract as follows : • Section 1-06 CONTROL OF MATERIAL o This section, located on page SP-24, is supplemented with the following: 1-06.1(2) Request for Approval of Materials (RAM) Supplement this section with the following: Duvall Avenue NE ADDENDUM NO. 4 TED4004100 June 17, 2021 Page 2 of 11 (***Renton***) The Engineer will require up to 7 calendar days from the date each RAM is submitted until it is returned to the Contractor. The Contractor shall not proceed with the Work represented by the RAM until comments from the Engineer have been addressed. • Section 1-07.17 Utilities and Similar Facilities o The addresses and telephone numbers of utilities located on pages SP-32-33 is replaced with the following: • Section 1-07.23(1) Construction Under Traffic o Special Driveway Conditions, located on page SP-40, the fifth paragraph is replaced with the following: 4. All driveways shall be restored with permanent proposed pavement surfaces, metal plates, and/or hot mix asphalt and re-opened to traffic at the end of each work day. Duvall Avenue NE ADDENDUM NO. 4 TED4004100 June 17, 2021 Page 3 of 11 • Section 1-08.0(1) Preconstruction Conference o This section, located on page SP-43, is supplemented with the following: (***Renton***) Prior to the Contractor beginning the construction of wheelchair ramps, a ramp preconstruction conference will be held between the Contractor, the Contracting Agency or their representative, the Engineer, Inspector, and all subcontractors who will perform the work. The purpose of the ramp preconstruction conference will be: 1. To discuss all ramps designs and constructions at all locations; 2. To verify ramps will meet ADA compliancy. Prior to the Contractor beginning the construction of adjusting manholes and catch basins, a preconstruction conference will be held in the field between the Contractor, the Contracting Agency or their representative, the Engineer, Inspector, and all subcontractors who will perform the work. The Contractor and their subcontractors who will perform the work shall be ready to adjust a one manhole or catch basin at one of the locations with mortar mix, mixer, and brick trowel on hand. • Section 1-09.3 Scope of Payment o The following new section is added: Section 1-09.3 is supplemented with the following: (August 7, 2017 WSDOT GSP, Option 1) Fuel Cost Adjustment General The Contracting Agency will make a fuel cost adjustment, either a credit or a payment, for qualifying changes in the index price of on-highway diesel fuel. The adjustment will be applied to partial payments made according to Section 1-09.9. The adjustment is not a guarantee of full compensation for fuel price changes. Any adjustment provided by this provision shall not obligate the Contracting Agency for any costs due solely to changes in fuel costs beyond the amount adjusted by this provision. The Contracting Agency does not guarantee that fuel will be available at the base fuel cost or monthly fuel cost. No additional adjustment will be made for rates of fuel consumption or actual fuel types that differ from those specified for the purpose of determining the adjustment. For the purpose of calculating the adjustment, the Base Fuel Cost shall be the Weekly fuel price from the U.S. Energy Information Administration website. The website location and directions are as follows: • http://www.eia.gov/petroleum/gasdiesel/ Duvall Avenue NE ADDENDUM NO. 4 TED4004100 June 17, 2021 Page 4 of 11 • On the web page, click on the West Coast less California, listed under the heading U.S On-Highway Diesel Fuel Prices*(dollar per gallon) at the lower end of the web page. • In the pull down box labeled Period pull down Weekly. • Click on the fuel price history found under the column heading View History for the line Diesel (On-Highway) – All Types. • On this web page obtain the nearest weekly fuel cost for the Monday occurring three weeks prior to the date that bids are opened. This weekly fuel cost becomes the Base Fuel Cost and is fixed for the duration of the Contract and will be used in calculating all adjustments. The Monthly Fuel Cost shall be the most recent Monthly fuel price from the U.S. Energy Information Administration website. The website location and directions are as follows: • http://www.eia.gov/petroleum/gasdiesel/ • On the web page, click on the West Coast less California, listed under the heading U.S On-Highway Diesel Fuel Prices*(dollar per gallon) at the lower end of the web page. • In the pull down box labeled Period pull down Monthly. • Click on the fuel price history found under the column heading View History for the line Diesel (On-Highway) – All Types. • On this web page obtain the most current monthly fuel price. If the specified index ceases to be available for any reason, the Contracting Agency at its discretion will select and begin using a substitute price source or index to establish the Monthly Fuel Cost. Measurement No adjustment will be made if the Monthly Fuel Cost is within 10 percent of the Base Fuel Cost. No adjustment will be made for work performed after the authorized Time for Completion. If the Monthly Fuel Cost is greater than or equal to 110% of the Base Fuel Cost, then: Adjustment = (Monthly Fuel Cost – (1.10 x Base Fuel Cost)) x Q If the Monthly Fuel Cost is less than or equal to 90% of the Base Fuel Cost, then: Adjustment = (Monthly Fuel Cost – (0.90 x Base Fuel Cost)) x Q Where Q =  ((Fuel Usage Factor for each Eligible Bid Item) x (Quantity paid in the current months progress estimate for each Eligible Bid Item)) for all Eligible Bid Items listed below: Duvall Avenue NE ADDENDUM NO. 4 TED4004100 June 17, 2021 Page 5 of 11 Eligible Bid Item Fuel Usage Factor *** Roadway Excavation Incl. Haul, per cubic yard 0.29 gal/cy Gravel Borrow Incl. Haul, per ton 0.17 gal/ton Structure Excavation Class B, per cubic yard 0.25 gal/cy Crushed Surfacing Top Course, per ton 0.70 gal/ton HMA Cl. 1/2 In. PG 64-22, per ton 0.90 gal/ton HMA for _____, per ton 0.90 gal/ton *** Payment Payment will be made for the following bid item when included in the bid proposal: “Fuel Cost Adjustment”, by calculation. To provide a common proposal for all bidders, the Contracting Agency has entered an amount in the proposal to become a part of the Contractor’s total bid. (August 6, 2018 WSDOT GSP, Option 2) Steel Cost Adjustment The Contractor may elect to participate in the steel cost adjustments for work permanently incorporated into this Contract. Steel cost adjustment is not a guarantee of full compensation for changes to the cost of steel items; not eligible for all items with steel; and any adjustment provided by this provision will not obligate the Contracting Agency for any costs beyond the amount adjusted by this provision. This Special Provision provides the option to opt-in to steel cost adjustments for eligible Bid items. The Contractor is provided one opportunity to opt-in and there are no future opt-out provisions. The steel cost adjustment requirements of this Special Provision apply for the duration of the Contract. General The Contractor may select Bid items from the list below to be included in the steel cost adjustment. The Contractor is not obligated to select any Bid items or to participate in the steel cost adjustment program. The steel cost adjustment will apply only to the Bid items selected by the Contractor. Prior to Contract execution the Contractor shall submit the Steel Cost Adjustment Opt-In Bid Item List, WSDOT Form 410-031, to the WSDOT Contract Ad and Award Office. The form is to be received at the WSDOT Bid Room, located at the Transportation Building, 310 Maple Park Avenue SE, Room 2D20, Olympia, WA 98501-2361 or may be submitted by facsimile to the following FAX number, (360) 705-6966. The Steel Cost Adjustment Opt-In Bid Item List shall be signed by an authorized representative of the Contractor. Should the Contractor fail to return this document as required no Bid items will be eligible for steel cost adjustment. Steel Index Values Duvall Avenue NE ADDENDUM NO. 4 TED4004100 June 17, 2021 Page 6 of 11 The Contracting Agency will use the Bureau of Labor Statistics (BLS) producer price index (PPI) series Id: WPUSISTEEL1 index value for steel cost adjustments. The Base Steel Materials Index Value (BV) will be the most recent value published on the BLS website on the day of bid opening. This value will be fixed on the d ay of bid opening even if the BLS lists this as a preliminary value. The Monthly Steel Materials Index Value (MV) will be the final index value published on the BLS website for any month during the Contract. Measurement The Contracting Agency has determined the initial cost basis (ICB) of steel to be *** $0.40/lb ***. This cost basis is reflected in the steel cost adjustment calculations below, is non-negotiable and will be taken as a fixed value for the duration of the Contract. For each month that steel material is incorporated into the permanent Work of the Contract or paid for as Materials on Hand and the MV is more than 110 percent or less than 90 percent of the BV the Contractor shall provide the Engineer with the following for each eligible Bid item by the end of the following month: 1. The weight of steel material for the month, and 2. Documentation of the weight and shipment to the Contractor of the steel material by bills of lading, invoices, or purchase orders. Should the Contractor not provide the required documentation as specified the following shall apply: 1. Steel material that has an MV that is more than 110 percent of the BV will not be eligible for a steel cost adjustment. 2. The steel cost adjustment for a Bid item with an MV that is less than 90 percent of the BV will be calculated using a weight of steel determined by the Engineer. Steel materials will not be eligible for cost adjustments until all requirements of the Contract have been met. Steel added to a Contract as part of a Value Engineering Change Proposal will not be eligible for steel cost adjustment. Steel cost adjustments made in accordance with this Special Provision will not be reflected on payments made to the Contractor until after the index value required for the calculat ion becomes final. Preliminary index values may be used to establish the BV, but will not be used to establish the MV in calculations. For each Bid Item selected by the Contractor on the Steel Cost Adjustment Opt-In Bid Item List form a cost adjustment evaluation will be made. A cost adjustment will only Duvall Avenue NE ADDENDUM NO. 4 TED4004100 June 17, 2021 Page 7 of 11 be made if the MV for the month the Work associated with the Bid Item is performed differs by more than ten-percent from the BV. The steel cost adjustment will be determined as follows: 1. If the MV is within ten-percent of the BV, there will be no adjustment. 2. If the MV is more than 110-percent of the BV, then CA = (((MV - BV) ÷ BV) - 0.10) × (ICB × WS) 3. If the MV is less than 90-percent of the BV, then CA = (((MV - BV) ÷ BV) + 0.10) × (ICB × WS) Where: CA = Cost Adjustment, dollars MV = Monthly Steel Materials Index Value from BLS for the month determined above BV = Base Steel Materials Index Value taken as the most recent value published on the BLS website on the day of bid opening. ICB = Initial Cost Basis of steel per pound WS = Weight of steel (in pounds) eligible for cost adjustment The following Bid Items are eligible for the steel cost adjustment program for this Project: *** All mailboxes support posts included under Section 8-18 of these Special Provisions All poles included under Section 8-20 of these Special Provisions *** Payment Payment will be made for the following bid item when included in the bid proposal: “Steel Cost Adjustment”, by calculation. To provide a common proposal for all bidders, the Contracting Agency has entered an amount in the proposal to become a part of the Contractor’s total bid. • Section 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters o The seventh paragraph, located on page SP-61, is revised as follows: (***Renton***) When an area where pavement, sidewalk, or driveway has been removed is to be opened to traffic before pavement patching has been completed, temporary hot mix Duvall Avenue NE ADDENDUM NO. 4 TED4004100 June 17, 2021 Page 8 of 11 asphalt concrete patch shall be required. Temporary patching shall be placed to a minimum depth of 2 inches immediately after backfilling and compaction are complete, and before the road is opened to traffic. MC hot mix shall be used at the discretion of the Engineer. • Section 7-05.3(1) Adjusting Manholes and Catch Basins to Grade o The second paragraph, located on page SP-107, is replaced with the following: Where shown in the Plans or where directed by the Engineer, the existing manholes, catch basins, or inlets shall be adjusted to the grade as staked or otherwise designated by the Engineer. Prior to adjustment, the Contractor shall hold a preconstruction conference per Section 1-08.0(1) of these Special Provisions. o The seventh paragraph, located on page SP-107, is replaced with the following: In asphalt concrete pavement: manholes shall be adjusted per Renton Standard 106. For Note 2 on City of Renton Standard Details 106, the depth of HMA shall be 8 inches. For Note 9 on City of Renton Standard Details 106, X shall equal 1’0”. • Section 7-09.3(21) Concrete Thrust Blocking o The fourth paragraph located on page SP-125 is revised to read as follows: Blocking shall be poured in place Ready-Mix Concrete Class 4000 with a minimum of compressive strength of 28 days of 4,000 psi. Job site mixing hand-mixed concrete and mobile concrete mixers are not allowed. • Section 8-02.3(2) Work Plans o The following paragraph is added after the second paragraph located on page SP- 149: The Plant Establishment Phan shall not be required. • Section 8-02.3(13) Plant Establishment o This section located on page SP-152 is deleted in its entirety and replaced with the following: 8-02.3(13) Plant Establishment Section 8-02.3(13) is replaced by the following: Upon acceptance of the project, the Plant Establishment period shall not be required. • Section 8-04 CURBS, GUTTERS, AND SPILLWAYS o 8-04.2 Material, located on page SP-157, the second paragraph is revised to read as follows: Duvall Avenue NE ADDENDUM NO. 4 TED4004100 June 17, 2021 Page 9 of 11 Cement concrete curb, all extruded curb, and curb and gutter shall be constructed with Class 4000 air entrained concrete conforming to the requirement of Section 6- 02 of the Standard Specifications. • Section 8-18 MAILBOX SUPPORT o The following new section is added: 8-18 MAILBOX SUPPORT 8-18.1 Description Section 8-18.1 is supplemented with the following: (******) This work shall include removal of the existing mailbox located at Station 916+31.2 RT; providing a temporary mailbox on stand, if required; returning the existing mailbox to the mailbox owner; and installation of a new locking mailbox on a new steel support with anti-twist plate in accordance with City of Renton Standard Details H027, H028 and H029, and as indicated in the Plans. 8-18.3 Construction Requirements Section 8-18.3 is supplemented with the following: (******) During construction, the mailbox and/or paper boxes shall be moved to a temporary location where its usefulness will not be impaired. The Contractor shall give the U.S. Postal Service Postmaster and mailbox owner written notice a minimum of 14 calendar days prior to relocation. The post shall be removed from its fixed location and be placed in a bucket or other suitable container and filled with sand, gravel, or other suitable means to hold it in place. The existing post shall be cut to length as necessary such that the height from the ground to the bottom of the box is 3 feet- 6 inches. The temporary box location shall be located such that delivery can be accomplished from within the delivery vehicle and shall be maintained at all times. The new locking mailbox and its relocation shall be in accordance with U.S. Postal Service requirements, have address numbers placed on the mailbox and attachment hardware to the post shall fit a lockbox-style mailbox. The Contractor is responsible for all coordination of the U.S. Postal Service and mailbox owner. 8-18.4 Measurement Section 8-18.4 is supplemented with the following: (******) Duvall Avenue NE ADDENDUM NO. 4 TED4004100 June 17, 2021 Page 10 of 11 The unit contract price for “Mailbox Support Type 1” shall be measured per each mailbox removed, temporarily relocated, existing mailbox returned to owner, and new locking mailbox installed on new steel support and foundation. 8-18.5 Payment “Mailbox Support Type 1”, per each. The unit contract price for “Mailbox Support Type 1” shall include, but not be limited to, all costs to provide, remove, temporarily relocate, return mailbox to mailbox owner and install new mailbox on new support, and shall also include bolts, grout, sleeves, backfill and steel posts, foundation, anti-twist plate, address numbering and coordination with the post office, and any coordination with the mailbox owner. • Section 8-20.3(4) Foundations o The third paragraph, located on page SP-168, is replaced with the following: Concrete shall be placed against undisturbed earth if possible. Disturbed earth or backfill material shall be compacted to ninety-five (95) percent of the material’s maximum density. Before placing the concrete, the Contractor shall block-out around any other underground utilities that lie in the excavated base so that the concrete will not adhere to the utility line. Concrete foundations shall be troweled, brushed, edged and finished in a workmanship-like manner. Concrete shall be promptly cleaned from the exposed portion of the anchor bolts and conduit after placement. Foundation shall all be Class 4000P concrete. After the specified curing period, the Contractor may install the applicable device thereon. Sonotubes are not allowed. • Section 8-20.3(5) E1 Opening Trenching o The seventh paragraph, located on page SP-173, is replaced with the following: Trench Depth Trench depth shall provide a minimum cover for conduit of 24-inches below the top of roadway based. Trench depth shall provide a minimum cover of 36 inches for all conduits designated for fiber optic cabling. • Section 8-20.3(16) Reinstalling Salvaged Material o The fourth paragraph, Flashing Beacon, located on page SP-184, is supplemented with the following: The current school beacons are: Manufacturer: IDC – Information display company (IDC was purchased by Carmanah; may be selling same product line and rebranded as Carmanah) Model: FL Duvall Avenue NE ADDENDUM NO. 4 TED4004100 June 17, 2021 Page 11 of 11 • Section 8-32 FIELD OFFICE BUILDING o This section located on pages SP-206-210 is deleted in its entirety. 3. APPENDIX D: RENTON STANDARD DETAILS AND WSDOT STANDARD PLANS Added City of Renton Standard H027 – Mailbox Installation – Sheet 1 of 3, attached to this Addendum. Added City of Renton Standard H028 – Mailbox Installation – Sheet 2 of 3, attached to this Addendum. Added City of Renton Standard H029 – Mailbox Installation – Sheet 3 of 3, attached to this Addendum. Added City of Renton Standard 106 – Typical Construction and Adjustment of Manhole Risers – Sheet 1 of 1, attached to this Addendum. ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT. CITY OF RENTON _______________________ Robert M. Hanson, P.E. Transportation Design Manager