HomeMy WebLinkAboutCO 119/10/2021          Approved by Cheryl Beyer via 9/10/2021 email CAG-20-126, CO #11-21 Change Order No. 11 Contract Title: Lake Washington Loop Trail Contract No. CAG -20-126 Page 2 of 3 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Change to Contract Plans: As required by Field Work Directives No 17, 20, 21, 23 and 24, the Contractor is directed perform additional work to construct improvements at the Shattuck and Logan Intersections. As required by Field Work Directive No 2, the Contractor is directed to delete the Pedestrian Rail Retrofit from the bridge. The deletion of this work caused a delays in renegotiating the subcontract for the bridge railing Type S BP-30 and subsequent delay in the purchase order for the railing. The contract time is extended by 28 working days. This change order addresses the additional time impact due to the changed work. Future change orders will address changes in costs due to the changed work. Reason for Change: Contract Plans: Above changes in the scope of the work affected work activities on the critical path schedule. Contractor negotiations (on above scope changes) with DBE subcontractor adversely affected the Bridge Railing activity, critical path of the baseline schedule. Subcontractor availability to perform extra work listed above eliminated ACI’s ability to perform multiple activities concurrently, as estimated in the baseline schedule. Materials: Associated material changes to be addressed in future change orders. Plans: Associated plan revisions to be addressed in future change orders Estimated Change Order Cost: This Change Order does not include an equitable adjustment per Section 1-09.4 of the 2020 WSDOT/APWA Standard Specifications. Cost changes to be addressed in future change orders.          Change Order No. 11 Contract Title: Lake Washington Loop Trail Contract No. CAG -20-126 Page 3 of 3 Extension of Time: The Contractor agrees that the time for Completion is extended an additional 28 Working Days for the changed work. Sections 1-04.4 and 1-04.5 of the 2020 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. Attachments: Forms to be attached to Change Order ܆ Plans ܈Field Directive ܆Change Order Quotation ܆Estimated Change Order Cost ܆Project Labor List ܆Force Account Equipment Rate Request (DOT Form 422-010 EF) ܆Equitable Adjustment Determination          Schedule Update 9-7-2021         Schedule Update 9-7-2021Added working days = 2+10+8+8 = 28 working days2 days shifted out intime due to the dele-tion of the irrigation(CO No 9)10 days shifted out intime due to signalmaterial procurementsuspension andbridge rail procure-ment suspension8 days shifted out to completethe Shattuck signal work afterthe Logan signal work. FWDsNo 23 and 24 allow eachexisting conduit run to becleaned out and rewired one-by-one to minimize risks ifthere is a conduit overfillissue.8 days shifted out due to material pro-curement delay with the street lights