Loading...
HomeMy WebLinkAboutContractAGREEMENT FOR STORMWATER MANAGEMENT ACTION PLANNING THIS AGREEMENT, dated for reference purposes only as November 1, 2021, is by and between Parametrix, Inc. a Washington corporation. The City and the Consultant are referred to collectively in this Agreement as the effective as of the last date signed by both parties. 1. Scope of Work: Consultant agrees to provide an assessment and prioritization of receiving waters and a stormwater management action plan as specified in Exhibit A, which is attached and incorporated herein and may hereinafter be referred to as the Work 2. Changes in Scope of Work: The City, without invalidating this Agreement, may order changes to the Workconsisting of additions, deletions or modifications.Any such changes to the Work shall be ordered by the City in writing and the Compensation shall be equitably adjusted consistent with the rates set forth in ExhibitBor as otherwise mutually agreed by the Parties. 3. Time of Performance: Consultant shall commence performance of the Agreement pursuant to the schedule(s) set forth in Exhibit C. All Work shall be performed by no later than June 30, 2023. 4. Compensation: A. Amount. Total compensation to Consultant for Work provided pursuant to this Agreement shall not exceed $240,896.12, plus any applicable state and local sales taxes. Compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit B. The Consultant agrees that any hourly or flat rate charged by it for its Work shall remain locked at the negotiated rate(s) unless otherwise agreed to in writing or provided in Exhibit B. Except as specifically provided herein, the Consultant shall be solely responsible for payment of any taxes imposed as a result of the performance and payment of this Agreement. B. Method of Payment. On a monthly or no less than quarterly basis during any quarter in which Workisperformed, the Consultant shall submit a voucher or invoice in aform specified by the City, including a description of what Work has been performed, the CAG-21-259 PAGE 2 OF 10 name of the personnel performing such Work, and any hourly labor charge rate for such personnel. The Consultant shall also submit a final bill upon completion of all Work. Payment shall be made by the City for Work performed within thirty (30) calendar days after receipt and approval by the appropriate City representative of the voucher or invoice. If the does not meet the requirements of this Agreement, the Consultant will correct or modify its performance to comply with the Agreement. The City may withhold payment for work that does not meet the requirements of this Agreement. C. Effect of Payment. Payment for any part of the Work shall not constitute a waiver by the City of any remedies it may have against the Consultant for failure of the Consultant to perform the Work or for any breach of this Agreement by the Consultant. D. Non-Appropriation of Funds. If sufficient funds are not appropriated or allocated for payment under this Agreement for any future fiscal period, the City shall not be obligated to make payments for Work or amounts incurred after the end of the current fiscal period, and this Agreement will terminate upon the completion of all remaining Work for which funds are allocated. No penalty or expense shall accrue to the City in the event this provision applies. 5. Termination: A. The City reserves the right to terminate this Agreement at any time, with or without cause by giving ten(10) calendar of such termination or suspension, all finished or unfinished documents, data, studies, worksheets, models and reports, or other material prepared by the Consultant pursuant to this Agreement shall be submitted to the City, if any are required as part of the Work. B. In the event this Agreement is terminated by the City, the Consultant shall be entitled to payment for all hours worked to the effective date of termination, less all payments previously made. If the Agreement is terminated by the City after partial performance of Work for which the agreed compensation is a fixed fee, the City shall pay the Consultant an equitable share of the fixed fee. This provision shall not prevent the City from seeking any legal remedies it may have for the violation or nonperformance of any of the provisions of this Agreement and such charges due to the City shall be deducted from the final payment due the Consultant. No payment shall be made by the City for any expenses incurred or work done following the effective date of termination unless authorized in advance in writing by the City. 6. Warranties And Right To Use Work Product : Consultant represents and warrants that Consultant will perform all Work identified in this Agreement in a professional and PAGE 3 OF 10 workmanlike manner and in accordance with all reasonable and professional standards and laws. Compliance with professional standards includes, as applicable, performing the Work in compliance with applicable City standards or guidelines (e.g. design criteria and Standard Plans for Road, Bridge and Municipal Construction). Professional engineers shall certify engineering plans, specifications, plats, and reports, as applicable, pursuant to RCW 18.43.070. Consultant further represents and warrants that all final work product created for and delivered to the City pursuant to this Agreement shall be the original work of the Consultant and free from any intellectual property encumbrance which would restrict the City from using the work product. Consultant grants to the City a non- exclusive, perpetual right and license to use, reproduce, distribute, adapt, modify, and display all final work product produced pursuant to this Agreement. adaptation, modification or use of the final work products other than for the purposes of this Agreement shall be without liability to the Consultant. The provisions of this section shall survive the expiration or termination of this Agreement. 7. Record Maintenance: The Consultant shall maintain accounts and records, which properly reflect all direct and indirect costs expended and Work provided in the performance of this Agreement and retain such records for as long as may be required by applicable Washington State records retention laws, but in any event no less than six years after the termination of this Agreement. The Consultant agrees to provide access to and copies of any records related to this Agreement as required by the City to audit expenditures and chargesand/or to comply with the Washington State Public Records Act (Chapter 42.56 RCW). The provisions of this section shall survive the expiration or termination of this Agreement. 8. Public Records Compliance: To the full extent the City determines necessary to comply with the Washington State Public Records Act, Consultant shall make a due diligent search of all records in its possession or control relating to this Agreement and the Work, including, but not limited to, e-mail, correspondence, notes, saved telephone messages, recordings, photos, or drawings and provide them to the City for production. In the event Consultant believes said records need to be protected from disclosure, it may, at Consultant shall indemnify, defend, or litigation related to a Public Records Act request for which Consultant has responsive records and for which Consultant has withheld records or information contained therein, or not provided them to the City in a timely manner. Consultant shall produce for distribution any and all records responsive to the Public Records Act request in a timely manner, unless those records are protected by court order. The provisions of this section shall survive the expiration or termination of this Agreement. 9. Independent Contractor Relationship: PAGE 4 OF 10 A. The Consultant is retained by the City only for the purposes and to the extent set forth in this Agreement. The nature of the relationship between the Consultant and the City during the period of the Work shall be that of an independent contractor, not employee. The Consultant, not the City, shall have the power to control and direct the details, manner or means of Work. Specifically, but not by means of limitation, the Consultant shall have no obligation to work any particular hours or particular schedule, unless otherwise indicated in the Scope of Work or where scheduling of attendance or performance is mutually arranged due to the nature of the Work. Consultant shall retain the right to designate the means of performing the Work covered by this agreement, and the Consultant shall be entitled to employ other workers at such compensation and such other conditions as it may deem proper, provided, however, that any contract so made by the Consultant is to be paid by it alone, and that employing such workers, it is acting individually and not as an agent for the City. B. The City shall not be responsible for withholding or otherwise deducting federal income tax or Social Security or contributing to the State Industrial Insurance Program, or otherwise assuming the duties of an employer with respect to Consultant or any employee of the Consultant. C. If the Consultant is a sole proprietorship or if this Agreement is with an individual, the Consultant agrees to notify the City and complete any required form if the Consultant retired under a State of Washington retirement system and agrees to indemnify any 10. Hold Harmless: The Consultant agrees to release, indemnify, defend, and hold harmless the City, elected officials, employees, officers, representatives, and volunteers from any and all claims, demands, actions, suits, causes of action, arbitrations, mediations, proceedings, judgments, awards, injuries, damages, liabilities, losses, fines, fees, penalties, by any and all persons or entities, arising from, resulting from, or related to the negligent acts, errors or omissions of the Consultant in its performance of this Agreement or a breach of this Agreement by Consultant, except for that portion of the claims caused by Should a court of competent jurisdiction determine that this agreement is subject to RCW 4.24.115, (Validity of agreement to indemnify against liability for negligence relative to construction, alteration, improvement, etc., of structure or improvement attached to real persons or damages to property caused by or resulting from the concurrent negligence of the PAGE 5 OF 10 It is further specifically and expressly understood that the indemnification provided in Insurance Act, RCW Title 51, solely for the purposes of this indemnification. The Parties have mutually negotiated and agreed to this waiver. The provisions of this section shall survive the expiration or termination of this Agreement. 11. Gifts and Conflicts: employees from soliciting, accepting, or receiving any gift, gratuity or favor from any person, firm or corporation involved in a contract or transaction. To ensure compliance to City employees or officials. Consultant also confirms that Consultant does not have a business interest or a close family relationship with any City officer or employee who was, is, or will be involved in selecting the Consultant, negotiating or administering this Ag Work. 12. City of Renton Business License : Unless exempted by the Renton Municipal Code, t Consultant shall obtain a City of Renton Business License prior to performing any Work and maintain the business license in good standing throughout the term of this agreement with the City. Information regarding acquiring a city business license can be found at: https://www.rentonwa.gov/Tax Information regarding State business licensing requirements can be found at: https://dor.wa.gov/doing-business/register-my-business 13. Insurance: Consultant shall secure and maintain: A. Commercial general liability insurance in the minimum amounts of $1,000,000 for each occurrence/$2,000,000 aggregate for the Term of this Agreement. B. In the event that Work delivered pursuant to this Agreement either directly or indirectly involve or require Professional Services, Professional Liability, Errors and Omissions coverage shall be provided with minimum limits of $1,000,000 per claim. "Professional Services", for the purpose of this section, shall mean any Workprovided by a licensed professional or Work that requires a professional standard of care. C. State of Washington, shall also be secured. D. Commercial Automobile Liability for owned, leased, hired or non-owned, leased, hired or non-owned, with minimum limits of $1,000,000 per occurrence combined single PAGE 6 OF 10 behalf of the City, beyond normal commutes. E. Consultant shall name the City as an Additional Insured on its commercial general liability policy on a non-ll not be a source for payment of any Consultant liability, nor shall the maintenance of any insurance required by this Agreement be construed to limit the liability of recourse to any remedy available at law or in equity. F. proper endorsements, shall be delivered to the City before performing the Work. G. Consultant shall provide the City with written notice of any policy cancellation, within two (2) business days of their receipt of such notice. 14. Delays: Consultant is not responsible for delays caused by factors beyond the controloccur, the City agrees the Consultant is not responsible for damages, nor shall the Consultant be deemed to be in default of the Agreement. 15. Successors and Assigns: Neither the City nor the Consultant shall assign, transfer or encumber any rights, duties or interests accruing from this Agreement without the written consent of the other. 16. Notices: Any notice required under this Agreement will be in writing, addressed to the appropriate party at the address which appears below (as modified in writing from time to time by such party), and given personally, by registered or certified mail, return receipt requested, by facsimile or by nationally recognized overnight courier service. Time period for notices shall be deemed to have commenced upon the date of receipt, EXCEPT facsimile delivery will be deemed to have commenced on the first business day following transmission. Email and telephone may be used for purposes of administering the Agreement, but should not be used to give any formal notice required by the Agreement. CITY OF RENTON Kristina Lowthian, Surface Water Engineer 1055 South Grady Way Renton, WA 98057 Phone: (425) 430-7249 klowthian@rentonwa.gov Fax: (425) 430-7241 CONSULTANT Julie Brandt, Senior Engineer - Surface Water 719 2nd Ave #200 Seattle, WA 98104 Phone: (206) 394-3661 JBrandt@parametrix.com PAGE 7 OF 10 17. Discrimination Prohibited: Except to the extent permitted by a bona fide occupational qualification, the Consultant agrees as follows: A. with regard to the Work performed or to be performed under this Agreement, shall not discriminate on the basis of race, color, sex, religion, nationality, creed, marital status, sexual orientation or preference, age (except minimum age and retirement provisions), honorably discharged veteran or military status, or the presence of any sensory, mental or physical handicap, unless based upon a bona fide occupational qualification in relationship to hiring and employment, in employment or application for employment, the administration of the delivery of Work or any other benefits under this Agreement, or procurement of materials or supplies. B. The Consultant will take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, creed, color, national origin, sex, age, sexual orientation, physical, sensory or mental handicaps, or marital status. Such action shall include, but not be limited to the following employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination, rates of pay or other forms of compensation and selection for training. C.-discrimination provisions, the City shall have the right, at its option, to cancel the Agreement in whole or in part. D. The Consultant is responsible to be aware of and in compliance with all federal, state and local laws and regulations that may affect the satisfactory completion of the project, which includes but is not limited to fair labor laws, worker's compensation, and Title VI of the Federal Civil Rights Act of 1964, and will comply with City of Renton Council Resolution Number 4085. 18. Miscellaneous:The parties hereby acknowledge: A. The City is not responsible to train or provide training for Consultant. B. Consultant will not be reimbursed for job related expenses except to the extent specifically agreed within the attached exhibits. C. Consultant shall furnish all tools and/or materials necessary to perform the Work except to the extent specifically agreed within the attached exhibits. PAGE 8 OF 10 D. In the event special training, licensing, or certification is required for Consultant to provide Work he/she will acquire or maintain such at his/her own expense and, if Consultant employs, sub-contracts, or otherwise assigns the responsibility to perform the Work, said employee/sub-contractor/assignee will acquire and or maintain such training, licensing, or certification. E. This is a non-exclusive agreement and Consultant is free to provide his/her Work to other entities, so long as there is no interruption or interference with the provision of Work called for in this Agreement. F. Consultant is responsible for his/her own insurance, including, but not limited to health insurance. G. Consultant is responsibl that for any persons employed by the Consultant. 19. Other Provisions: A. Approval Authority. Each individual executing this Agreement on behalf of the City and Consultant represents and warrants that such individuals are duly authorized to execute and deliver this Agreement on behalf of the City or Consultant. B. General Administration and Management.project manager is Kristina Lowthian. In providing Work, Consultant shall coordinate with th manager or his/her designee. C. Amendment and Modification. This Agreement may be amended only by an instrument in writing, duly executed by both Parties. D. Conflicts. In the event of any inconsistencies between Consultant proposals and this Agreement, the terms of this Agreement shall prevail. Any exhibits/attachments to this Agreement are incorporated by reference only to the extent of the purpose for which they are referenced within this Agreement. To the extent a Consultant prepared exhibit conflicts with the terms in the body of this Agreement or contains terms that are extraneous to the purpose for which it is referenced, the terms in the body of this Agreement shall prevail and the extraneous terms shall not be incorporated herein. E. Governing Law. This Agreement shall be made in and shall be governed by and interpreted in accordance with the laws of the State of Washington and the City of Work in accordance with all applicable federal, state, county and city laws, codes and ordinances. PAGE 9 OF 10 F. Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared by the joint efforts of the Parties and shall not be construed against one party or the other as a result of the preparation, substitution, submission or other event of negotiation, drafting or execution. G. Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or interpret this Agreement or any of its terms or covenants shall be brought in the King County Superior Court for the State of Washington at the Maleng Regional Justice Center in Kent, King County, Washington, or its replacement or successor. Consultant hereby expressly consents to the personal and exclusive jurisdiction and venue of such court even if Consultant is a foreign corporation not registered with the State of Washington. H. Severability. part of this Agreement is illegal or unenforceable shall not cancel or invalidate the remainder of this Agreement, which shall remain in full force and effect. I. Sole and Entire Agreement. This Agreement contains the entire agreement of the Parties and any representations or understandings, whether oral or written, not incorporated are excluded. J. Time is of the Essence. Time is of the essence of this Agreement and each and all of its provisions in which performance is a factor. Adherence to completion dates set forth in the description of the Work this Agreement. K. Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be construed to give any rights or benefits in the Agreement to anyone other than the Parties, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the Parties and no one else. L. Binding Effect. The Parties each bind themselves, their partners, successors, assigns, and legal representatives to the other party to this Agreement, and to the partners, successors, assigns, and legal representatives of such other party with respect to all covenants of the Agreement. M. Waivers. failure to enforce any provision of this Agreement shall not be a waiver and shall not prevent either the City or Consultant from enforcing that provision or any other provision of this Agreement in the future. Waiver of breach of any provision of this Agreement shall not be deemed to be a waiver of any prior or subsequent breach unless it is expressly waived in writing. PAGE 10 OF 10 N. Counterparts. The Parties may execute this Agreement in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date last signed by the Parties below. CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ Armondo Pavone Mayor Jenifer Young EP&C Division Manager _____________________________ Date _____________________________ Date Attest _____________________________ Jason A. Seth City Clerk Approved as to Legal Form By: __________________________ Shane Moloney Renton City Attorney Contract Template Updated 5/21/2021 Nonstandard 10/11/21 clb 1758 11-3-2021 Approved by Cheryl Beyer via 11/1/2021 email City of Renton Stormwater Management Action Planning (SMAP) PROJECT UNDERSTANDING The City of Renton Plan (SMAP), which is required by the Washington State Department of Ecology (Ecology) National Pollutant Discharge Elimination System (NPDES) Phase II Municipal Stormwater Permit (Permit). Parametrix will apply Ecology guidance to conditions unique to the City to prepare a SMAP that is based on Permit requirements. The effort will also include consideration of (Ecology 2019, Publication 19-10-010). The project is partially funded by a Stormwater Financial Assistance Program (SFAP) grant from Ecology that has not been finalized at the time of this scope development. Anticipated deliverables to be generated by Parametrix based on . (Ecology requirements included in the final grant award that do not match these would be considered out of scope.) TASK 1 NOT USED This task number is not used in in the Parametrix contract order to align with the task numbering in the grant award. Task 1 in the grant is reserved for the City to track and administer its grant contract for the SMAP directly with Ecology. TASK 2A PROJECT MANAGEMENT The purpose of this task is to track, manage, document, and report on the Parametrix work effort. Approach Parametrix will track and administer this contract with the City, including preparing monthly invoices and Project milestones will be based on the attached project schedule. Assumptions Project management will extend through June 30, 2023 (21 months). Deliverables Monthly invoices and progress reports QA/QC review documentation (delivered upon request) SCOPE OF WORK (continued) City of Renton 553-1779-887 Stormwater Management Action Planning (SMAP) 2 October 2021 TASK 2B PROJECT INITIATION AND NEEDS ASSESSMENT This purpose of this task is to define the project objectives, establish team member roles and communications, and define data gaps and needs. Approach City Staff Workshop: Parametrix will prepare for and facilitate a project kickoff workshop with City staff. The workshop will include introduction of the project team; definition of the project objectives; review of the scope of work and schedule milestones; describe the communications plan; and prepare the risk register. Data Collection: Parametrix will obtain available GIS data from the City and other readily-available sources to complete the receiving water inventory, building substantially on the work conducted as part of the development Memorandum. Examples of available data to be collected are: Basin hydrography/water feature mapping, including streams and lakes or other receiving waters Basin topography Aerial photos Watershed catchment delineations Drainage system maps Stormwater facility location and type maps Land cover, including soils, vegetation type, tree canopy, and condition Impervious surfaces Public rights-of-way ADT (where data is readily available) Vacant land maps (if available) Future proposed land use from zoning, growth plans, and active building projects (if applicable) Critical areas, such as wetlands, steep slopes or geologic hazards, buffers, and floodplains Water quality and stream conditions Watershed Characterization Project National Water Quality Assessment Program SAM produced regional receiving water assessments Phase I Counties permit modeling and basin plan reports Data not available will be assessed in the data gaps analysis (see below). SCOPE OF WORK (continued) City of Renton 553-1779-887 Stormwater Management Action Planning (SMAP) 3 October 2021 Data Gap Analysis: Parametrix will prepare a brief memorandum discussing: A list of data not available, Gaps recommended to be filled for the project, and Gaps that can be accepted and addressed through assumptions or extrapolation from other sources. Assumptions Up to 4 Parametrix staff members will participate in the City staff workshop. One 2-hour meeting is assumed. The City will identify and invite other City staff to participate in the workshop. The City will coordinate the kickoff meeting location and time and have key City staff at the meetings based on planned topics. Where available, the City will provide Parametrix with information in electronic format via email, FTP site transfer, or file a share platform hosted by Parametrix (such as OneDrive/SharePoint or Project Wise). Geographic information system (GIS) data described above Most recent NPDES annual reports and stormwater management program documents Assessment and Stormwater Management Memorandum Available water quality data from City-led or available surface water or stormwater monitoring programs available Results of recent stormwater system needs assessment, including map of problem areas and basic project sheets developed to-date The City will provide Parametrix with document review comments from all City reviewers consolidated into a single electronic file. Data gaps that the City chooses to be filled for the project will be addressed by the City. (Parametrix can collect certain data for additional scope and fee.) The City will directly request available information from other public entities, such as WRIAs, the County, the Army Corps, or Ecology. Data gaps that cannot be filled will be addressed through assumptions or extrapolation from other sources to the extent possible. Deliverables Agenda for City Staff Workshop Brief data gaps memorandum (2 to 3 pages) SCOPE OF WORK (continued) City of Renton 553-1779-887 Stormwater Management Action Planning (SMAP) 4 October 2021 TASK 2C RECEIVING WATER ASSESSMENT The goal of this task is to assess existing information collected in Task 2 to document relative conditions of the local receiving waters and contributing areas based on the requirements of Permit Section S.5.C.1.d.i. Approach Basin Boundary Check: Parametrix will use existing watershed catchment delineations and potentially resize, combine, or subdivide drainage areas based on analysis units compatible with SMAP review. Watershed Inventory: Parametrix will: Identify common basin characteristics for reviewing and categorizing condition and need. Review data gathered in Task 2 pertaining to landscape characteristics (land use and cover, road density, age of development/stormwater management infrastructure, impervious area, stream buffers, intact floodplains, and crossings) that usually affect surface water conditions. Assess the relative development potential in the basin using available vacant (undeveloped parcels) and developable (non-floodplain, steep slope, or similar critical areas) land. Work with the City to identify water quality conditions to that may need improvement. NPDES Table and Map: Parametrix will prepare a Watershed Inventory and accompanying web map documenting the drainage areas based on Permit requirements. As previously stated, the inventory will build substantially on Assessment and Stormwater Management Memorandum. The inventory will be in table format and will include: Each receiving water name, its total watershed area, the percent of the total watershed area that is in the A brief description of the relative conditions of the receiving waters based on currently available basic water quality assessment information and the contributing areas condition based on current land cover and known stormwater management. stormwater management system coverage. Findings of the stormwater management influence assessment for each basin and indication of which receiving waters will be included in the S5.C.1.d.ii prioritization process. Parametrix will also include a web map of the delineated basins with references to the watershed inventory table. Parametrix will create a copy of the web map with select layers for the City to share with Ecology. City Check-In Meeting w period to present the draft Watershed Inventory, answer questions, and collect preliminary comments. Assumptions Parametrix will base the assessment on data collected during Task 2. No new data will be collected for this effort. Existing basin boundaries may be slightly updated, but no new basin delineations will be prepared. SCOPE OF WORK (continued) City of Renton 553-1779-887 Stormwater Management Action Planning (SMAP) 5 October 2021 The City will provide Parametrix with document review comments from all City reviewers consolidated into a single electronic file. The schedule includes a lag of 10 business days for Ecology review of draft grant deliverables; however, Parametrix will continue or suspend effort on this task based on direction by the City. For all Ecology submittals (grant deliverables, Permit submittals, etc.), Parametrix will submit documents to the City, and the City will submit the documents to Ecology. Deliverables Draft Watershed Inventory technical memorandum for City review in Microsoft Word and PDF electronic file formats (3 to 5 pages, not including data table, map, and attachments). Draft Receiving Water Conditions Assessment that includes a conditions assessment table, proposed MS4 influence method, and analysis (anticipated grant deliverable) Web map for Ecology access depicting delineated basins with references to the watershed inventory table (anticipated grant deliverable) Response to Ecology Receiving Water Conditions Assessment online GIS interface, conditions assessment table, MS4 influence method, and analysis comments (anticipated grant deliverable) Final Watershed Inventory technical memorandum for City review in Microsoft Word and PDF electronic file formats (3 to 5 pages, not including data table, map, and attachments). Final Receiving Water Conditions Assessment including online GIS interface (anticipated grant deliverable) TASK 3 RECEIVING WATER PRIORITIZATION The purpose of this task is to establish prioritization of watershed protection needs to help identify which of the anning based on the requirements of Permit Section S.5.C.1.d.ii. Approach Watershed Prioritization: Parametrix will work with the City to prioritize watersheds. Through this process, Parametrix will: Prepare prioritization metrics for local watersheds for review and agreement by the City. Identify restoration or protection goal(s) for each watershed or watershed group based on basin characteristics and protection needs. Evaluate current and potential opportunities to address watershed restoration and protection goals for each watershed or watershed group. Prioritize watersheds or watershed groups based on agreed metrics using a GIS/spreadsheet scoring tool. Work with the City to identify additional, non-quantifiable opportunities and constraints such as political support, funding applicability, community perception, etc. in the watershed prioritization. Identify a single watershed or watershed group to target for stormwater management planning in Task 4. City Check-In Meeting: Parametrix will period to present the draft Watershed Prioritization, answer questions, and collect preliminary comments. SCOPE OF WORK (continued) City of Renton 553-1779-887 Stormwater Management Action Planning (SMAP) 6 October 2021 Public Engagement Support: Parametrix will prepare a web-based GIS story map suitable for distribution to the Public and for the City to share with Ecology. A public comment field will be included in the story map to solicit feedback. In addition, Parametrix will develop a brief (5 to 10 slides) presentation and support City staff in briefing Assumptions Parametrix will base the prioritization on data collected during Task 2. No new data will be collected for this effort. The City will provide Parametrix with document review comments from all City reviewers consolidated into a single electronic file. The City will perform all public advertisement, outreach, and distribution of the web-based GIS story map provided by Parametrix. presentation. The schedule includes a lag of 10 business days for Ecology review of draft deliverables; however, Parametrix will continue or suspend effort on this task based on direction by the City. For all Ecology submittals (grant deliverables, Permit submittals, etc.), Parametrix will submit documents to the City, and the City will submit the documents to Ecology. Translation services are dependent on a number of factors including content complexity, language combinations, turnaround time, and formatting. Parametrix can sub-contract for translation service to most regionally used languages for an additional fee. Deliverables Draft prioritization methodology (anticipated grant deliverable) Draft public outreach materials to provide the public and stakeholders with an opportunity to comment on proposed prioritized catchment area(s) (anticipated grant deliverable) Response to Ecology prioritization methodology comments (anticipated grant deliverable) Draft Receiving Water Prioritization technical memorandum for City review in Microsoft Word and PDF electronic file formats (approximately 10 pages, not including appendices) Final Receiving Water Prioritization technical memorandum in Microsoft Word and PDF electronic file formats (approximately 10 pages, not including appendices) A web-based GIS story map suitable for distribution to the public and for the City to share with Ecology Receiving Water Prioritization and results memorandum, including list of high-priority catchment area(s) and online GIS interface (anticipated grant deliverable) Documentation of public outreach, collection of stakeholder feedback, City responsiveness to comments (anticipated grant deliverable) TASK 4 STORMWATER MANAGEMENT ACTION PLAN The goal of this task is to identify and document high-level stormwater management activities that may improve the condition of the high-priority watershed identified in Task 3 based on the requirements of Permit Section S.5.C.1.d.iii. SCOPE OF WORK (continued) City of Renton 553-1779-887 Stormwater Management Action Planning (SMAP) 7 October 2021 Approach Action Identification: Parametrix will work with the City to identify and create a list of: Concept-level potential stormwater facility retrofits for the area, including identification of BMP types (in broad categories such as distributed LID retrofits, regional flow control facilities, targeted water quality media filtration for particular pollutants, etc.) and preferred locations where possible (in general categories such as regional vs. site-specific facilities, retrofits in the right-of-way vs. parcels, excluded areas such as protected natural resources, etc.) Land management/development strategies and/or actions for water quality management Targeted, enhanced, or customized permit-related stormwater management actions such as IDDE field screening, prioritization or source control inspections, O&M inspections, enhanced maintenance, and/or public education and outreach behavior change programs. If applicable, changes needed to local long-range plans to address SMAP priorities A proposed implementation schedule and budget sources for short- and long-term actions A process for future assessments and feedback to inform future changes Public Engagement Support: Parametrix will: Support the City in preparing for a virtual/online Public Open House to present the SMAP process so far and outline the potential identified actions. Update the web-based GIS story map for use during the Open House and suitable for distribution to the Public afterwards to facilitate comment collection. SMAP Report: Parametrix will develop a SMAP report that outlines the identified actions and incorporates adjustments based on public comment, as approved by the City. SEPA Checklist: Parametrix will prepare a SEPA checklist, supporting figures, and text of a public notification for City Check-In Meeting period to present the draft SMAP Report, answer questions, and collect preliminary comments. Assumptions Up to 3 Parametrix staff members will participate in the Public Open House. One 2-hour meeting is assumed. The City will identify and invite other City staff to participate in the Public Open House, coordinate the online platform and time, and conduct public advertising of the event leading up to it. Parametrix will be responsible for developing the figures which will be included in the SMAP. The Receiving Water Assessment and Receiving Water Prioritization technical memoranda prepared under earlier tasks will be included as appendices to the SMAP Report. The City will provide Parametrix with document review comments from all City reviewers consolidated into a single electronic Excel table file. SCOPE OF WORK (continued) City of Renton 553-1779-887 Stormwater Management Action Planning (SMAP) 8 October 2021 The schedule includes a lag of 10 business days for Ecology review of draft deliverables; however, Parametrix will continue or suspend effort on this task based on direction by the City. For all Ecology submittals (grant deliverables, Permit submittals, etc.), Parametrix will submit documents to the City, and the City will submit the documents to Ecology. Deliverables Draft list of stormwater management actions for structural retrofits and targeted areas for City review in Microsoft Word and PDF electronic file formats Draft list of structural and non-structural Stormwater Management Actions (SMAs) (anticipated grant deliverable) Web map layer showing SMA facility retrofits with catchment areas and facility footprint(s) (anticipated grant deliverable) An update to the public web-based GIS story map to facilitate comment collection. Documentation of collected stakeholder feedback and City responsiveness to comments (anticipated grant deliverable) City Draft SMAP Report for one high-priority basin for City review in Microsoft Word and PDF electronic file formats, approximately 30 pages (not including appendices) Draft SMAP for Ecology, including supporting narrative, proposed schedule, conceptual budget, potential funding sources, and adaptive management (anticipated grant deliverable) Response to ECOLOGY SMAP comments (anticipated grant deliverable) Final SMAP Report for one high-priority basin in Microsoft Word and PDF electronic file formats, approximately 30 pages (not including appendices) Final written SMAP for Ecology, including list of SMAs for targeted areas and online GIS interface (anticipated grant deliverable) Julie G.BrandtAriannaFrenderPaul S.FendtChad L.TinsleyTheodore B.PrinceAmandaThompsonJohn PhillipsSarah RifeErinFergusonPatricia E. YiSusan E.SwiftDebra M.FetherstonShanon L.HarrisJean N.JohnsonLori A.GilbertsonSr EngineerEngineer IISrConsultantSr GISAnalystSr EngineerEngineer IISr.ConsultantEngineer IIIPlannerSr GraphicDesignerTechnicalEditorPublicationsSupervisorProjectControlsSpecialistSr.ContractsAdminSr. ProjectAccountant Nov 2021Dec 2021Dec 2021Jan 2022Mar 2022Mar 2022Apr 2022May 2022Jun 2022Jul 2022Aug 2022Sep 2022Oct 2022Nov 2022Dec 2022Jan 2023Feb 2023Mar 2023Apr 2023May 2023Jun 2023