Loading...
Wall and Vault Requirements1 \\rv12rfps02\Depts\PW\CED\Data\Forms-Templates\Self-Help Handouts\Building\2021 Forms -DRAFT MK\Requirements -Word\2020 Electronic Vault&WallReq.docx Rev. 1/18/21 THE APPLICANT SHALL SUBMIT AN ELECTRONIC COPY OF THE COMPLETE SET OF PLANS ACCORDING TO RENTON FILE STANDARDS FOR ANY STRUCTURE OR ADDITION. SUBMITTED PLANS SHOULD BE A BUILDABLE SET OF DOCUMENTS. DUE TO THE CLOSURE OF CITY HALL TO THE PUBLIC WE ARE CURRENTLY USING A FILE SHARING SERVICE TO ACCEPT APPLICATIONS ELECTRONICALLY. EMAIL PERMITTECH@RENTONWA.GOV WITH THE FOLLOWING INFORMATION: • APPLICATION TYPE • ADDRESS OF PROPOSED WORK • PROJECT NAME YOU WILL BE PROVIDED WITH A LINK TO A WEBPAGE FOR YOUR APPLICATION MATERIALS. 1. Completed Building Permit Application 2. A complete set of engineered plans, including site plans. 3. Where specifications supplement the construction drawings, include a separate files for structural details, elevations and civil plans. 4. Stress/structural calculations, if applicable. 5. Geotechnical report, if applicable. 6. Special Inspection Authorization Form. (See attached.) THE SITE PLAN SHALL CLEARLY SHOW THE FOLLOWING: 1. Scale (1” = 20’or 1” = 40’) and North Arrow. 2. Location, identification and dimensions of all buildings, property lines, streets, alleys and easements. Indicate condition of all public right-of-ways and submit verification of right to use easements. 3. Location of wall or vault and distance to all buildings, property lines, streets, alleys and easements. GENERAL NOTES MUST INCLUDE THE FOLLOWING: (PREFERABLY ON COVER SHEET) 1. The full name of the project. 2. The name, address and telephone number of owner and agent(s). 3. The area, in square feet or acres, of the project site. SUBMITTAL REQUIREMENTS VAULTS AND WALLS Development Services Division 1055 S. Grady Way Renton, WA 98057 (425) 430-7200 www.rentonwa.gov 2 \\rv12rfps02\Depts\PW\CED\Data\Forms-Templates\Self-Help Handouts\Building\2021 Forms -DRAFT MK\Requirements -Word\2020 Electronic Vault&WallReq.docx Rev. 1/18/21 4. The existing zoning of the project site. 5. The seismic design category of the project site (D). 6. Structural design criteria. 7. The IBC designation of occupancy group (U - 1). 3 \\rv12rfps02\Depts\PW\CED\Data\Forms-Templates\Self-Help Handouts\Building\2021 Forms -DRAFT MK\Requirements -Word\2020 Electronic Vault&WallReq.docx Rev. 1/18/21 Project Name: Address: Responsibility under Section 109 of the International Building Code (IBC) for selection of a testing laboratory lies with the owner or his agent (architect or structural engineer of record). The following have been or will be contracted with to perform all SPECIAL INSPECTIONS required per Chapter 17, IBC and the Renton Building Department. o Structural Considerations Testing Agency: Telephone: Address: City/State/Zip: o Geotechnical Considerations Per Soils Report Geotechnical Engineer of Record: Testing Agency: Telephone: Address: City/State/Zip: We understand that these assignments cannot be changed (transferred) once the building permit has been issued without the approval of the Building Official. The completed form must be returned to the City of Renton Plans Examiner prior to issuance of the Building Permit. Print Name Signature of Owner/Authorized Agent Date SPECIAL INSPECTION AUTHORIZATION FORM Development Services Division 1055 S. Grady Way Renton, WA 98057 (425) 430-7200 www.rentonwa.gov