Loading...
Electrical RequirementsH:CED\Data\Forms-Templates\Self-HelpHandouts\Building\ElectReq.doc Rev. 02/16 ELECTRICAL PLAN REVIEW REQUIREMENTS CITY OF RENTON Development Services Division 1055 South Grady Way, Renton WA 98057 Phone: (425) 430-7200 Plan review required for: Service over 400 Amps, Hospitals, Schools, Institutions, Nursing Homes, and Assisted Living Facilities. ITEMS REQUIRED FOR ELECTRICAL PLAN REVIEW SUBMITTAL  1. Completed Electrical Permit Application with description of the full scope and nature of electrical installation. Provide name, phone number and email address for contact person for electrical plan review questions.  2. Electronic copy of the plans on a USB flashdrive according to Renton electronic file standards.  3. Indicate building use (or portion of) per WAC 296-46B-900-(1). Include the basis for designation of any special occupancy or classified location(s).  4. Electrical Engineer’s stamp and signature shall be on all Educational Facilities, Hospitals, and Nursing Homes; All services or feeders rated 1,600 amperes or larger, all installations identified in the National Electrical Code requiring engineering supervision.  5. Symbol legends.  6. Circuit connecting lines with home runs shown for all equipment, lighting, and receptacle symbols.  7. One-line riser diagram; including available fault current; Available Interrupt Current (AIC) ratings of switchboards and/or panel boards, and equipment bracing. Riser diagrams and load calculations m ust be complete to the point of connection between the facilities of the serving utility and the premises wiring. Identify all service and feeder conductors, including conductor size, material, insulation, and overcurrent protection, conduit size, number, and type. Show transformer primary/secondary voltage and KVA size.  8. Provide panel and switchboard schedules showing overcurrent protection, conductor size, insulation, type, and branch circuit loads.  9. Provide load calculations for all panel boards and other distribution equipment affected by the electrical work being done. Include total connected load, demand factors , and calculated loads.  10. Verify the street address (inspection address) for this project.  11. Floor plan views including lighting schedule and energy code switching requirements (occupancy sensors, daylighting, automatic shut off controls, photosensors) of electrical installation or alteration.  12. Adequate capacity and rating shall be indicated when existing service feeder has additional loads added.  13. Indicate if service or feeder is to be altered or installed.