Loading...
HomeMy WebLinkAboutQuestions & Answers No. 6Page 1 of 2     RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) October 28, 2022 The responses to bidder inquiries, unless incorporated into a formal addendum to the contract, are not  part of the contract and are provided for the bidders’ convenience only. The responses may be  considered along with all other information furnished to prospective bidders for the purpose of bidding  on the project. The use of information provided in the responses or bidder inquires is not to be  construed in any way as a waiver of the provisions nor excuse the contrator from full compliance with  the contract requirements. Bidders are cautioned that subsequent responses or contract addenda may  affect or vary response previously given and any such subsequent response of addenda should be taken  into consideration when submitting a bid for the project.  Questions and Answers No. 6   1. Question: Addendum 4, plan sheet 120, revision to water & sewer utility clearance states that  sewer and storm pipe shall be either C900 or DI, depending on size, when minimum clearance  cannot be met from ex. water main. Does this requirement also apply when minimum clearance  cannot be met with new water main?     For example would the 30’ of 12” SD from structure 148 to 147 on plan sheet 93 need to be bid a  C900 because the minimum 1.5’ clearance is not met between the storm and the new 8” water  main? And would the 66’ of 18” SD between structure 144 and 143 on plan sheet 93 need to be DI  because the minimum clearance is not met between the 8” water main.     Additionally, addendum 4 revised a portion of the 18” poly pipe to 18” DI pipe, was this revision  made because of clearance issue with the water main? If so, does it need to be bid as CL52 with  polywrap per spec. section 7‐04.2?    Answer:  Water and sewer utility clearance detail sheet 120 applies to when minimum clearance  cannot be met with existing water main and new water main.    Projections have been updated to clarify new 8” water main satisfies the minimum 1.5’ clearance  from the 30’ of 12” SD run from structure 148 to 147 and the 66’ of 18” SD between structure 144  and 143. Addendum 8 will be issued with updated plan sheets 92‐93.     The 18” DI Pipe revision was made in Addendum 4 due to clearance. Per spec section 7‐04.2 this  run does require DIP with polywrap.         Page 2 of 2    2. Question: Regarding the Extruded Curb and the Modified Concrete Extruded Curb Type 6 (bid  items A114 and A115)     Section 8‐04.3(1) of the special provisions reads, “…Modified Cement Concrete Extruded Curb  Type 6, and Extruded Curb shall be constructed with air entrained concrete class 4000…”     Section 8‐04.3(1) of the standard specifications allows that air entrained concrete Class 3000 can  be utilized for curb (including extruded curb); with the exception that air entrained concrete class  4000 shall be used for full width of a driveway entrance.      As the modified concrete extruded curb type 6 and extruded curb will not be placed at a driveway  entrance, will it be acceptable to utilize air entrained concrete class 3000 for BI’s A114 and A115?    Answer:  Modified concrete extruded curb type 6 and extruded curb shall be Class 4000 per  special provision 8‐07.3(1). See also plans Roadway Section sheets 5‐9, general typical section  note #7 on roadway section sheets of the plans (sheet 5‐9) that states “All cement concrete used  in project shall be class 4000.”                                                          End of Questions and Answers No. 6