Name Project Name Project/File Description
SWP2702265.1
HOUSER WAY STORM SYSTEM REPLACEMENT Replace existing 24" pipe with about 450 l.f. of new 36" stormline in 800 block Houser Way N. Additional (change order) to R-2265 - SR-900 HOV/HOUSER WAY NORTH RELOCATION (BY-PASS) Project. Storm line AS BUILT EL data Information see R-2265 Entranco Drainage Analysis, Plan Profile Sht 2-9
TED4002265.1
SR-900 HOV/HOUSER WAY NORTH RELOCATION Houser Way by-pass from SR-900 to N 8th St and Houser Way intersection. CIP Project includes curb, gutter, sidewalks, asphalt concrete paving, retaining walls 235 foot tunnel, signal, street lighting, storm drainage and landscape. PMGR: Joe Armstrong ENG: Entranco Engineers. R-2265 drawing sheets #12 & #14 of 94 contain water information.
HomeSearchMy WebLinkAboutContract