Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
Binding Site Plan
Civil Construction Permit Application Process and Submittal Requirements
Civil Construction Permit Title Block
Commercial Interior Remodel Requirements
Commercial Multifamily Requirements
Comp Plan or Text Amend
Conditional Use Permit
Critical Areas Exemption
Critical Areas Variance
Design District A Checklist
Design District B Checklist
Design District C Checklist
Design District D Checklist
Design District E Checklist
Easement - Release Process and Submittal Requirements
Electrical Requirements
Environmental (SEPA) Review Submittal Requirements
Espresso Stand Requirements
Final Planned Urban Development
Final Plat
Grade and Fill Permit
Latecomer Agreement Application Process and Submittal Requirements
Lot Line Adjustment
Manufactured and Mobile Home Requirements
Master Site Plan Review
Mechanical Residential Online Tipsheet
Modification
Modification of City Center Sign Regulations
Modification of Residential Design Regulations
Modification of Site Plan
Modification of Urban Design District Sign Regulations
Modification of Urban Design Regulations
Noise Variance (Greater Than 2 nights of Disturbance) Process and Requirements
Noise Variance (Up to 2 nights of Disturbance) Process and Requirements
Noise Variance Supplemental Documents
Pool, Hot Tub and Spa Requirements
Pre-Application
Preliminary Planned Urban Development
Preliminary Plat
Preload Requirements
Record Drawing Process and Requirements
Residential Building Requirements
Residential Drainage Submittal Process and Requirements
Residential Interior Remodel Requirements
Residential Plan Title Blocks (DWG)
Residential Plan Title Blocks (PDF)
Revisions to Existing Land Use Application
Rezone with Development
Rezone without Development
Routine Vegetation Management Permit
Shoreline Conditional Use Permit
Shoreline Exemption
Shoreline Susbstantial Development Permit
Shoreline Variance
Short Plat
Short Plat Recording
Site Plan Review
Special Fence Permit
Special Permit
Street Vacation Petition Process and Submittal Requirements
Temporary Use Tier 1
Temporary Use Tier 2
Urban Design Regulation Modification
Variance
Wall and Vault Requirements
Wireless Requirements